Comprehensive production system for French market of substations
This advanced system is designed for the efficient production and assembly of precast substations, ensuring precision, quality, and streamlined workflow.


This advanced system is designed for the efficient production and assembly of precast substations, ensuring precision, quality, and streamlined workflow.


Installation of a range of electric stair moulds with or without lower/upper landings combined with a set of combicasters.


To meet customer’s requirements, Construx-Weckenmann suggested two-gang moulds, of which both pockets can be used independently.


Thanks to its long base and in view of the fact that the panels are 1500mm high on one side and 1800mm high on the other side, the stair mould is easily adaptable for producing stairs in a wide selection of widths and lengths.


Design of an automated production unit for substations.


These are 4 special Multibats, designed for the French market.


This mould is designed for manufacturing trapezoidal beams.


This installation is designed for the production of prestressed concrete beams, with adjustable width between 300mm and 600mm. The non-reactive mould consists of a 40-meter compartment.