Precast tunnel segments for the HS2 railway line between London and Birmingham

Tunnels in M-shaped double arch construction. Each with 1 central pier, 2 arch walls and 2 arch roofs.

A total of 13290 segments to be produced in 28 moulds:

  •  5 moulds for central piers
  • 10 moulds for arch walls
  • 10 moulds for arch roofs
  • 3 special moulds for central piers with emergency doors

Advantages:

  • High-quality moulds with stainless steel sheeting
  • Intensive preliminary phase with the customer: concept - study - design
Get more out of our website by using cookies

Our website uses cookies to, among other things, give you the best user experience and to track visitor statistics.

I accept all cookies Refuse cookies Set up your preferences