4 Non-reacting beds with flexible girder moulds
For securing the moulds, the 105m long beds have a 50mm increment pattern of holes, every 1000mm, on both sides of the bed.


For securing the moulds, the 105m long beds have a 50mm increment pattern of holes, every 1000mm, on both sides of the bed.


This rigid steel mould is designed to produce beams with a height of 445mm and a width of 300mm.


The 3 moulds are composed of two main parts: a stressing frame and a table with side forms.


The capacity was expanded with self-reacting and nonreacting beds with moulds for girders, purlins, IV-beams and bridge beams.


Construx-Weckenmann provided a flexible and efficient precast production system for this Hungarian precast company, including 9 self-reacting casting beds designed for various prestressed beams (rectangular, inverse-T, I-girders, IV-roof, and T-roof).


The Construx-Weckenmann hydraulically operated adjustable mould sits on rails with 2 movable side.




To meet customer’s requirements, Construx-Weckenmann suggested two-gang moulds, of which both pockets can be used independently.


Shrinkable inside mould with retractable outside mould for standard pedestrian bridge.




Bed with open structure to accommodate moulds for sleepers, bridge beams or any other type of prestressed element.


3 non-reacting prestressing lines with 2 complete sets of modular moulds for different types of IV roof beams with small or large bulges, from 18m up to 36m.


This mould is designed for manufacturing trapezoidal beams.


This casting bed has self-reacting size-forms for 4 types of U-shaped bridge beams.


Prestressed crane rail sleepers for the London Gateway project.


Longitudinally prestressed wall panels with a maximum length of 10m.


Modular and removable self-reacting beds to produce prestressed elements. A total of 4 beds with each an overall length of 86m and a usable length of 80m.


Each of these 3 Construx-Weckenmann self-reacting casting beds consists of a 36,5m long bed, an active stressing head called the live-end, a passive stressing head called the dead-end and a set of 2 hydraulic cylinders.


Construx-Weckenmann installs 3 casting beds without major civil works. The capacity of the factory is extended with 3 beds of 24m, 36m, and 60m.


Construx-Weckenmann installed a complete package of 2 self-reacting prestressing beds with 3 complementing flexible and adjustable girder formwork systems.


A full steel table with vibrators and heating in a 500T self-reacting frame.


Construx-Weckenmann supplied 2 very wide 500T self-reacting frames to accommodate timber or steel moulds, without any need for foundation works or special anchors to hold the frame down.


Construx-Weckenmann supplies a 50m long 200T self-reacting mould for the production of turnout sleepers.


Construx-Weckenmann supplies 3 self-reacting moulds of 600T each for the production of TT floor elements.


Construx-Weckenmann supplies 2 self-reacting moulds with a net length of 75m each.


Construx-Weckenmann supplied different types of multigang railway sleeper moulds to fit in existing carrousel systems.


This installation is designed for the production of prestressed concrete beams, with adjustable width between 300mm and 600mm. The non-reactive mould consists of a 40-meter compartment.


This 60m long and 8m wide frame consists of rails which serve as support and fixation for modular bridge beam moulds.